Al-Quds Project

conveyor line/hidden pits jacking method

Our company has constructed a sewage line (heavy water) along AL QUDS Street and a length of 5000 m. starting from Hamza Square to 83 Square and this transport line Intakes pumps and discharges heavy water and rainwater for the sectors of Sadr Clity and Jamila neighborhood and alleviate the bottlenecks In the sewage systems and then drainage and connectivity on the main zibeline line and helps the vertical pumping station In the area of Habible by withdrawing part of the amount of water entering It and then pump Into zibeline main line, In addition to the establishment of rain gully to draw surface water on The length of AL-Quds Street and according to the design plans.

Work details

First: the vertical station of AL-Quds Street (Habibiya 2):

The station was constructed with a depth of 14 meters below the natural ground level and an area of 22,500 square meters with a pumping capacity of up to 53,000 cubic meters per hour.

Second: line carrier

Our company has implemented the main carrier line with a diameter of 2000 mm by the hidden drilling method (JACKING MACHINE) and the length of (5000 m) and includes the line inspection basin in special sizes (large) and with 20 inspection basins have been connected all the substations and rainwater networks located within the line of the main conveyor line implemented.

DEVELOPMENT OF SITE WORKS AND PROJECTS

The company manufactured a steel base for the machine in addition to the base previously existing with the machine, and this would reduce the time period in transferring the machine from one inspection basin to another upon completion of drilling

THE WORK IS DEVIDED:

The installation Stages of station concrete walls.

Foundation.