The Great Basra Water Project

All trenchless excavation and open excavation works for the project were subcontracted to our company, which specializes in this field, as a secondary contractor named and confirmed in the contract with the Ministry of Housing and Construction. The work is carried out under the supervision of the Ministry of Housing and Construction and the Kuwaiti Al-Mir Company.

Al-Masar Mall for Electronics

Our company designed and executed a commercial building located on Al-Sinaa Street, covering an area of 1,200 square meters and consisting of eight floors, including shops and offices. The project was carried out by our specialized team with the highest standards of quality in materials, workmanship, and finishes, using modern and attractive methods. The execution was supervised by the Baghdad Investment Commission.

Al-Quds Project - Lifting Station and Transmission Line using Trenchless Method.

Our company completed the construction of a heavy sewage pipeline project along Al-Quds Street, with a total length of 5000 meters, starting from Al-Hamza Square to 83rd Square. This transmission line is responsible for collecting and draining sewage and rainwater for the sectors of Sadr City and Hayy Jamila, alleviating the congestion in the sewage networks, and then discharging and connecting to the main Zublin line.

Other projects

Contracting

Contracting

Contracting

Contracting